Completed Orders

E.g., 4/5/26
E.g., 4/5/26
Completed Orders
Number Title Type of Problem Prioritysort descending Progress Level Requested Deadline? Created
2363 Toilet Problem Custodial High Priority Completed 3/8/26 3/7/26
2376 2 lights out in backroom Urgent High Priority Completed 3/20/26 3/19/26
2377 Leaking urinal Repair High Priority Completed 3/20/26 3/19/26
2347 Ceiling leak in Cottonwood Room Repair High Priority Completed 3/13/26 2/26/26
2379 GCFI Outlet blown and won't reset - No Power Repair High Priority Completed 3/24/26 3/23/26
2384 Plate is coming up Repair High Priority Completed 3/31/26 3/26/26
2357 light bulb out and ceiling tile need replaced Cosmetic High Priority Completed 3/5/26 3/4/26
2355 Drain issue Preventive Maintenance High Priority Completed 3/5/26 3/4/26
2350 paint and patch for first floor union art gallery Cosmetic High Priority Completed 3/2/26 2/27/26
1813 toilet issue Repair High Priority Completed 10/12/24 10/11/24
1476 there is a brown spot on the ceiling in the office Urgent High Priority Completed 10/25/23 10/24/23
1649 clogged drain Unspecified Assistance High Priority Completed 4/21/24 4/20/24
1648 Forum lightboard Repair High Priority Completed 4/19/24 4/18/24
1480 Multiple lights out in Forum Hall Urgent High Priority Completed 11/3/23 11/2/23
1746 Safety lighting in Forum Hall repair not done properly Safety High Priority Completed 8/7/24
1482 Repair of the automatic door open/closure Repair High Priority Completed 11/13/23 11/4/23
1483 Vapor lock in pipes in Forum hall Repair High Priority Completed 11/13/23 11/4/23
1645 plug issue Repair High Priority Completed 4/19/24 4/18/24
1486 Door opener is not working, repairs appear to be taking a very long time. Repair High Priority Completed 11/17/23 11/6/23
1749 Lights out Repair High Priority Completed 8/16/24 8/15/24
1641 South Elevator Repair High Priority Completed 4/17/24 4/16/24
1491 water not meeting temp in Pretzelmaker Urgent High Priority Completed 11/9/23 11/7/23
1492 WELDING BALL RETURN FRAMING Repair High Priority Completed 11/8/23 11/7/23
1495 toilet issue Repair High Priority Completed 11/16/23 11/15/23
1496 toilet issue Repair High Priority Completed 11/16/23 11/15/23
1497 toilet issue Repair High Priority Completed 11/17/23 11/16/23
1498 Deodorizer Repair High Priority Completed 11/28/23 11/22/23
1757 There is a toilet in the all gender restroom on first that is leaking. Repair High Priority Completed 8/28/24 8/23/24
1629 Brush Scrubber Repair High Priority Completed 4/9/24 4/8/24
1502 Chair arm on second floor concourse has come loose. Cosmetic High Priority Completed 12/1/23 11/28/23
1503 door closer broken Repair High Priority Completed 12/1/23 11/30/23
1821 North Handicap Tension Arm Repair High Priority Completed 10/18/24 10/17/24
1626 LED light fixtures over booths are out and need repaired or replaced. Urgent High Priority Completed 4/16/24 4/8/24
1625 Clock in Courtyard is display wrong time Cosmetic High Priority Completed 4/10/24 4/8/24
1624 Stage and spot lights in Main Ballroom need replaced or repaired Repair High Priority Completed 4/10/24 4/4/24
1508 Radina's drain is backing up Urgent High Priority Completed 12/5/23 12/4/23
1509 Medical box Repair High Priority Completed 12/9/23 12/6/23
1510 Leak from flushvalve in North Men's restroom Repair High Priority Completed 12/13/23 12/12/23
1818 Carpet edging has come off in Big 12 Room Cosmetic High Priority Completed 10/19/24 10/16/24
1618 Hang Corey's Directors Portrait Unspecified Assistance High Priority Completed 4/9/24 4/1/24
1617 Forum hall sound is not working IT High Priority Completed 4/9/23 3/30/24
1515 Drain leak in the north 2nd floor men's restroom Urgent High Priority Completed 12/19/23 12/18/23
1769 Podium rail Repair High Priority Completed 9/4/24 9/3/24
1610 Women's toilet in forum Repair High Priority Completed 3/23/24 3/22/24
1609 Toilet leak Repair High Priority Completed 3/23/24 3/22/24
1553 Toilet sensor needs batteries Repair High Priority Completed 2/5/24 2/4/24
1785 Ceiling light fixture not functioning. Repair High Priority Completed 9/28/24 9/23/24
1786 Lights out Repair High Priority Completed 9/24/24 9/23/24
1547 Toilet in 2nd floor women's is leaking Custodial High Priority Completed 1/25/24 1/24/24
1579 Window has shifted and needs suction cups to reset Repair High Priority Completed 3/6/24 3/4/24
Export Completed Orders