Completed Orders
| Number | Title | Type of Problem |
Priority |
Progress Level | Requested Deadline? | Created |
|---|---|---|---|---|---|---|
| 2350 | paint and patch for first floor union art gallery | Cosmetic | High Priority | Completed | 3/2/26 | 2/27/26 |
| 2355 | Drain issue | Preventive Maintenance | High Priority | Completed | 3/5/26 | 3/4/26 |
| 2363 | Toilet Problem | Custodial | High Priority | Completed | 3/8/26 | 3/7/26 |
| 1609 | Toilet leak | Repair | High Priority | Completed | 3/23/24 | 3/22/24 |
| 1476 | there is a brown spot on the ceiling in the office | Urgent | High Priority | Completed | 10/25/23 | 10/24/23 |
| 1832 | 2nd floor South Men's sinks | Repair | High Priority | Completed | 10/29/24 | 10/28/24 |
| 1649 | clogged drain | Unspecified Assistance | High Priority | Completed | 4/21/24 | 4/20/24 |
| 1480 | Multiple lights out in Forum Hall | Urgent | High Priority | Completed | 11/3/23 | 11/2/23 |
| 1648 | Forum lightboard | Repair | High Priority | Completed | 4/19/24 | 4/18/24 |
| 1482 | Repair of the automatic door open/closure | Repair | High Priority | Completed | 11/13/23 | 11/4/23 |
| 1483 | Vapor lock in pipes in Forum hall | Repair | High Priority | Completed | 11/13/23 | 11/4/23 |
| 1486 | Door opener is not working, repairs appear to be taking a very long time. | Repair | High Priority | Completed | 11/17/23 | 11/6/23 |
| 1645 | plug issue | Repair | High Priority | Completed | 4/19/24 | 4/18/24 |
| 1749 | Lights out | Repair | High Priority | Completed | 8/16/24 | 8/15/24 |
| 1641 | South Elevator | Repair | High Priority | Completed | 4/17/24 | 4/16/24 |
| 1491 | water not meeting temp in Pretzelmaker | Urgent | High Priority | Completed | 11/9/23 | 11/7/23 |
| 1492 | WELDING BALL RETURN FRAMING | Repair | High Priority | Completed | 11/8/23 | 11/7/23 |
| 1495 | toilet issue | Repair | High Priority | Completed | 11/16/23 | 11/15/23 |
| 1496 | toilet issue | Repair | High Priority | Completed | 11/16/23 | 11/15/23 |
| 1497 | toilet issue | Repair | High Priority | Completed | 11/17/23 | 11/16/23 |
| 1498 | Deodorizer | Repair | High Priority | Completed | 11/28/23 | 11/22/23 |
| 1757 | There is a toilet in the all gender restroom on first that is leaking. | Repair | High Priority | Completed | 8/28/24 | 8/23/24 |
| 1629 | Brush Scrubber | Repair | High Priority | Completed | 4/9/24 | 4/8/24 |
| 1502 | Chair arm on second floor concourse has come loose. | Cosmetic | High Priority | Completed | 12/1/23 | 11/28/23 |
| 1503 | door closer broken | Repair | High Priority | Completed | 12/1/23 | 11/30/23 |
| 1626 | LED light fixtures over booths are out and need repaired or replaced. | Urgent | High Priority | Completed | 4/16/24 | 4/8/24 |
| 1821 | North Handicap Tension Arm | Repair | High Priority | Completed | 10/18/24 | 10/17/24 |
| 1625 | Clock in Courtyard is display wrong time | Cosmetic | High Priority | Completed | 4/10/24 | 4/8/24 |
| 1624 | Stage and spot lights in Main Ballroom need replaced or repaired | Repair | High Priority | Completed | 4/10/24 | 4/4/24 |
| 1508 | Radina's drain is backing up | Urgent | High Priority | Completed | 12/5/23 | 12/4/23 |
| 1509 | Medical box | Repair | High Priority | Completed | 12/9/23 | 12/6/23 |
| 1510 | Leak from flushvalve in North Men's restroom | Repair | High Priority | Completed | 12/13/23 | 12/12/23 |
| 1618 | Hang Corey's Directors Portrait | Unspecified Assistance | High Priority | Completed | 4/9/24 | 4/1/24 |
| 1818 | Carpet edging has come off in Big 12 Room | Cosmetic | High Priority | Completed | 10/19/24 | 10/16/24 |
| 1617 | Forum hall sound is not working | IT | High Priority | Completed | 4/9/23 | 3/30/24 |
| 1515 | Drain leak in the north 2nd floor men's restroom | Urgent | High Priority | Completed | 12/19/23 | 12/18/23 |
| 1769 | Podium rail | Repair | High Priority | Completed | 9/4/24 | 9/3/24 |
| 1770 | Blind fell | Repair | High Priority | Completed | 9/5/24 | 9/4/24 |
| 1573 | Bluemont Walk-in Freezer | Repair | High Priority | Completed | 2/29/24 | 2/28/24 |
| 1786 | Lights out | Repair | High Priority | Completed | 9/24/24 | 9/23/24 |
| 1801 | Bowling Cat Cash and Dining Dollars | IT | High Priority | Completed | 10/4/24 | 10/3/24 |
| 1579 | Window has shifted and needs suction cups to reset | Repair | High Priority | Completed | 3/6/24 | 3/4/24 |
| 1547 | Toilet in 2nd floor women's is leaking | Custodial | High Priority | Completed | 1/25/24 | 1/24/24 |
| 1788 | Lights out in Cottonwood/Flinthills hallway | Cosmetic | High Priority | Completed | 10/4/24 | 9/25/24 |
| 1576 | Window has shifted and open - Need suction cups to slide it back | Repair | High Priority | Completed | 3/1/24 | 2/29/24 |
| 1789 | Damaged paint and ceiling tile | Cosmetic | High Priority | Completed | 10/25/24 | 9/25/24 |
| 1574 | Walk in freezer. | Repair | High Priority | Completed | 3/1/24 | 2/28/24 |
| 1557 | Director frames outside of the Director's Conf. Rm. | Unspecified Assistance | High Priority | Completed | 3/17/24 | 2/14/24 |
| 1564 | Elevator door not shutting | Repair | High Priority | Completed | 2/18/24 | 2/17/24 |
| 1562 | Toliet cracked | Repair | High Priority | Completed | 2/17/24 | 2/16/24 |
- 1 of 46
- next ›

