Completed Orders
Number | Title | Type of Problem |
Priority![]() |
Progress Level | Requested Deadline? | Created |
---|---|---|---|---|---|---|
261 | Broken tile on wall at Chick Fil A | Cosmetic | High Priority | Completed | 9/26/18 | 9/15/18 |
1685 | South Elevator is not working. | Repair | High Priority | Completed | 5/31/24 | 5/29/24 |
477 | Hang signs for Union Kitchen | Cosmetic | High Priority | Completed | 4/12/19 | 4/8/19 |
919 | Can light out, 2nd floor south men's restroom. | Safety | High Priority | Completed | 11/30/21 | 11/24/21 |
140 | Replace clock | Cosmetic | High Priority | Completed | 6/19/18 | 6/18/18 |
1010 | Auto flush valve will not shut off | Urgent | High Priority | Completed | 5/13/22 | 5/10/22 |
233 | found the cart that is making marks on floor at north seating by CFA | Urgent | High Priority | Completed | 8/31/18 | 8/30/18 |
887 | Paint restroom | Cosmetic | High Priority | Completed | 8/21/21 | 8/20/21 |
1102 | fast drip at mop sink | Repair | High Priority | Completed | 9/15/22 | 9/9/22 |
108 | Remove empty wooden frames | Cosmetic | High Priority | Completed | 5/31/18 | 5/25/18 |
200 | toliet wont completly flush | Repair | High Priority | Completed | 8/10/18 | 8/9/18 |
1194 | clean coin counter machine | Urgent | High Priority | Completed | 1/13/23 | 1/5/23 |
1497 | toilet issue | Repair | High Priority | Completed | 11/17/23 | 11/16/23 |
293 | low water per flush | Repair | High Priority | Completed | 10/10/18 | 10/9/18 |
727 | Toilet leaking onto floor | Urgent | High Priority | Completed | 7/31/20 | 7/24/20 |
1373 | Re-install Forum Hall Signs | Unspecified Assistance | High Priority | Completed | 7/21/23 | 7/14/23 |
1918 | North Freight Elevator | Repair | High Priority | Completed | 1/31/25 | 1/30/25 |
1037 | The first floor south fire door is sticking open due to loose hinges | Safety | High Priority | Completed | 7/1/22 | 6/27/22 |
172 | turn the water temperature up going to the dishwasher in Bluemont kitchen | Safety | High Priority | Completed | 7/23/18 | 7/21/18 |
49 | drain clogged | Repair | High Priority | Completed | 4/4/18 | 4/3/18 |
1130 | Drain issue | Urgent | High Priority | Completed | 10/9/22 | 10/8/22 |
1557 | Director frames outside of the Director's Conf. Rm. | Unspecified Assistance | High Priority | Completed | 3/17/24 | 2/14/24 |
355 | Re-Key door lock 301 | Enhancement | High Priority | Completed | 11/24/18 | 11/12/18 |
1347 | Clean up of paint project on stairway | Cosmetic | High Priority | Completed | 6/21/23 | 6/15/23 |
1530 | toilet issue | Repair | High Priority | Completed | 1/6/24 | 1/5/24 |
761 | The LED cove lighting above the entrance to the ID Center and Cat Tech is out. | Cosmetic | High Priority | Completed | 8/29/20 | 8/18/20 |
1498 | Deodorizer | Repair | High Priority | Completed | 11/28/23 | 11/22/23 |
294 | water leak | Repair | High Priority | Completed | 10/10/18 | 10/9/18 |
1038 | remove cabinet and cap electrical | Cosmetic | High Priority | Completed | 6/29/22 | 6/27/22 |
388 | scrubber wouldnt shut off and had no suction | Repair | High Priority | Completed | 1/4/19 | 1/3/19 |
1039 | Build shelves and office chairs | Cosmetic | High Priority | Completed | 7/8/22 | 6/28/22 |
822 | Leaking toilet | Safety | High Priority | Completed | 2/26/21 | 2/24/21 |
1467 | Toilet not flushing | Custodial | High Priority | Completed | 10/11/23 | 10/9/23 |
696 | Replacement of damaged ceiling tile in K and S Ballroom | Repair | High Priority | Completed | 2/5/20 | 2/26/20 |
1687 | drain in womens bathroom is coming up | Repair | High Priority | Completed | 5/31/24 | 5/30/24 |
921 | Auto scrubber fuse issue | Repair | High Priority | Completed | 12/8/21 | 12/7/21 |
356 | Re-Key door lock 304A | Enhancement | High Priority | Completed | 11/24/18 | 11/12/18 |
1348 | Padded scrubber batteries | Preventive Maintenance | High Priority | Completed | 6/16/23 | 6/15/23 |
142 | Hang Dry Erase Board | Cosmetic | High Priority | Completed | 6/21/18 | 6/19/18 |
1886 | Washer is leaking when it is running and water is all over the floor behind it. | Repair | High Priority | Completed | 12/14/24 | 12/7/24 |
574 | light bulbs | Safety | High Priority | Completed | 8/10/19 | 7/22/19 |
1223 | 1st sink in women's restroom is dripping. | Repair | High Priority | Completed | 2/25/23 | 2/19/23 |
235 | Repair of handwash sink in Salad Spot | Urgent | High Priority | Completed | 9/8/18 | 8/30/18 |
110 | need to service towel dispenser and soap/sanitizer dispensers in Just Salad | Custodial | High Priority | Completed | 5/31/18 | 5/30/18 |
762 | Bad batteries | Repair | High Priority | Completed | 8/20/20 | 8/19/20 |
202 | Adjust shelf in Cashier's office and help lift boxes onto shelves | Enhancement | High Priority | Completed | 8/9/18 | 8/9/18 |
1196 | outlet in copy room not working | Repair | High Priority | Completed | 1/12/23 | 1/11/23 |
634 | Molding coming loose | Cosmetic | High Priority | Completed | 10/23/19 | 10/18/19 |
420 | ice machine in Union Station | Safety | High Priority | Completed | 1/22/19 | 1/21/19 |
1727 | drain blockage | Repair | High Priority | Completed | 7/20/24 | 7/17/24 |