Completed Orders
| Number | Title | Type of Problem |
Priority |
Progress Level | Requested Deadline? | Created |
|---|---|---|---|---|---|---|
| 595 | Move wooden cabinet | Unspecified Assistance | High Priority | Completed | 8/24/19 | 8/15/19 |
| 603 | Lock on the left door to the KSU Hallway will not unlock | Urgent | High Priority | Completed | 9/4/19 | 9/3/19 |
| 606 | Damage ceiling tile | Cosmetic | High Priority | Completed | 9/11/19 | 9/6/19 |
| 607 | Stained ceiling tile | Cosmetic | High Priority | Completed | 9/19/19 | 9/6/19 |
| 608 | Office chair has a broken wheel! | Repair | High Priority | Completed | 9/10/19 | 9/9/19 |
| 612 | Keg cooler with Kombucha at Union Kitchen has quit pouring | Urgent | High Priority | Completed | 9/11/19 | 9/10/19 |
| 617 | Cabinet door is off the hinges and a chair wheel has broken off one of the chairs | Repair | High Priority | Completed | 9/19/19 | 9/17/19 |
| 618 | Take down frame | Unspecified Assistance | High Priority | Completed | 9/21/19 | 9/18/19 |
| 620 | fix chair | Safety | High Priority | Completed | 9/27/19 | 9/23/19 |
| 621 | fix chair | Safety | High Priority | Completed | 9/27/19 | 9/23/19 |
| 622 | Bolts have become loose and coming out of front of Union Kitchen | Cosmetic | High Priority | Completed | 9/27/19 | 9/23/19 |
| 630 | Remove foam boards from marketing | Unspecified Assistance | High Priority | Completed | 10/14/19 | 10/11/19 |
| 634 | Molding coming loose | Cosmetic | High Priority | Completed | 10/23/19 | 10/18/19 |
| 637 | problems with lock on Business office door | Urgent | High Priority | Completed | 10/24/19 | 10/24/19 |
| 643 | Repaint the east wall in the Bluemont Room | Cosmetic | High Priority | Completed | 10/24/19 | 10/28/19 |
| 644 | Damaged paint and plaster on corner in K Ballroom | Cosmetic | High Priority | Completed | 10/24/19 | 10/28/19 |
| 653 | Door handle screws are loosening and backing out. | Safety | High Priority | Completed | 11/23/19 | 11/20/19 |
| 659 | cooler not keeping temp | Safety | High Priority | Completed | 12/11/19 | 12/10/19 |
| 660 | cooler not keeping temp | Safety | High Priority | Completed | 12/11/19 | 12/10/19 |
| 676 | Railing wires have come loose. | Cosmetic | High Priority | Completed | 1/31/20 | 1/28/20 |
| 678 | wall outlet | Urgent | High Priority | Completed | 1/30/20 | 1/29/20 |
| 685 | Sink Sanitizer Dispenser is not working | Safety | High Priority | Completed | 2/11/20 | 2/10/20 |
| 688 | dishwasher temp is not reaching 180 degrees for rinse | Safety | High Priority | Completed | 2/18/20 | 2/17/20 |
| 690 | need to install a holder for spray nozzle | Preventive Maintenance | High Priority | Completed | 2/18/20 | 2/17/20 |
| 696 | Replacement of damaged ceiling tile in K and S Ballroom | Repair | High Priority | Completed | 2/5/20 | 2/26/20 |
| 707 | Handrail bracket off rail in Forum Hall | Safety | High Priority | Completed | 5/30/20 | 5/15/20 |
| 710 | Missing soap dispenser in women's restroom | Safety | High Priority | Completed | 7/25/20 | 5/28/20 |
| 713 | Air nozzle on bike repair station has come off. | Repair | High Priority | Completed | 8/8/20 | 6/9/20 |
| 718 | Soap dispenser in the First floor south women's restroom needs to be reinstalled/replaced | Cosmetic | High Priority | Completed | 6/26/20 | 6/25/20 |
| 721 | Nosing has come off of a level in the Big 12 Room | Cosmetic | High Priority | Completed | 7/23/20 | 6/26/20 |
| 722 | Adjust timers on the restroom wallgate units. | Safety | High Priority | Completed | 7/25/20 | 7/2/20 |
| 723 | Cover needs to be reinstalled on an elecrical box in K mechanical room | Safety | High Priority | Completed | 7/25/20 | 7/6/20 |
| 724 | Cover panel on Plaza electric tower has come off. | Safety | High Priority | Completed | 7/25/20 | 7/14/20 |
| 725 | Bucket chair in Big 12 Room is broken and needs replacment. | Urgent | High Priority | Completed | 8/7/20 | 7/17/20 |
| 727 | Toilet leaking onto floor | Urgent | High Priority | Completed | 7/31/20 | 7/24/20 |
| 729 | Tile loose | Safety | High Priority | Completed | 7/30/20 | 7/29/20 |
| 730 | dish machine not reaching temp | Safety | High Priority | Completed | 8/7/20 | 7/31/20 |
| 732 | install Cover-19 plexiglass at Call Hall | Cosmetic | High Priority | Completed | 8/7/20 | 8/3/20 |
| 734 | HR file cabinet lock replacement | Repair | High Priority | Completed | 8/7/20 | 8/4/20 |
| 735 | hang Covid 19 plexiglas at Qdoba | Unspecified Assistance | High Priority | Completed | 8/6/20 | 8/4/20 |
| 736 | repair/replace rubber foot on vertical toaster from CFA | Repair | High Priority | Completed | 8/7/20 | 8/4/20 |
| 740 | tile issue in food court | Repair | High Priority | Completed | 8/7/20 | 8/6/20 |
| 749 | Leaking pipe | Repair | High Priority | Completed | 8/15/20 | 8/14/20 |
| 750 | soap dispenser down | Repair | High Priority | Completed | 8/15/20 | 8/14/20 |
| 751 | Install additional insulation tape on chilled water seams. | Repair | High Priority | Completed | 8/19/20 | 8/14/20 |
| 757 | Material washing out of north canopy area staining columns | Cosmetic | High Priority | Completed | 8/23/20 | 8/17/20 |
| 761 | The LED cove lighting above the entrance to the ID Center and Cat Tech is out. | Cosmetic | High Priority | Completed | 8/29/20 | 8/18/20 |
| 762 | Bad batteries | Repair | High Priority | Completed | 8/20/20 | 8/19/20 |
| 763 | Faucet in south ground floor men's restroom not working. | Repair | High Priority | Completed | 8/24/20 | 8/19/20 |
| 765 | A couple issues with the padded scrubber | Repair | High Priority | Completed | 8/28/20 | 8/27/20 |
- ‹ previous
- 13 of 47
- next ›

