Completed Orders
| Number | Title | Type of Problem |
Priority |
Progress Level | Requested Deadline? | Created |
|---|---|---|---|---|---|---|
| 1718 | Electrical issue | Repair | High Priority | Completed | 7/16/24 | 7/12/24 |
| 1841 | Leak behind pinsetters | Repair | High Priority | Completed | 10/31/24 | 10/30/24 |
| 1704 | Fridge/freezer in UPC is not cooling | Repair | High Priority | Completed | 7/3/24 | 7/2/24 |
| 1667 | Battery replacement | Preventive Maintenance | High Priority | Completed | 5/11/24 | 5/9/24 |
| 1456 | hand soap dispenser is empty in kitchen area of suite 114 | Custodial | High Priority | Completed | 9/30/23 | 9/29/23 |
| 1668 | urinal issue | Repair | High Priority | Completed | 5/13/24 | 5/11/24 |
| 1454 | The vacuum on the engraving machine has no suction | Repair | High Priority | Completed | 10/2/23 | 9/28/23 |
| 1669 | urinal issue | Repair | High Priority | Completed | 5/13/24 | 5/11/24 |
| 1737 | 2nd floor concourse clock | Enhancement | High Priority | Completed | 7/30/24 | 7/29/24 |
| 1451 | Northeast Elevator Stuck | Urgent | High Priority | Completed | 9/26/23 | 9/24/23 |
| 1672 | Toilet in gender neutral restroom won't flush. | Custodial | High Priority | Completed | 5/20/23 | 5/11/24 |
| 1736 | Camera not working | IT | High Priority | Completed | 7/26/24 | 7/25/24 |
| 1845 | Ice bin leaking on front line | Repair | High Priority | Completed | 11/7/24 | 11/6/24 |
| 1846 | Hot water is not at the proper temp | Repair | High Priority | Completed | 11/7/24 | 11/6/24 |
| 1674 | Cold | Unspecified Assistance | High Priority | Completed | 5/14/24 | 5/13/24 |
| 1445 | Light out in the Director's Office outer office | Repair | High Priority | Completed | 9/23/23 | 9/20/23 |
| 1676 | Carpet Extractors | Repair | High Priority | Completed | 5/15/24 | 5/14/24 |
| 1849 | batteries in paper towel dispenser | Urgent | High Priority | Completed | 11/7/24 | 11/7/24 |
| 1678 | Vents in the dining areas need to be cleaned. This is a second request. | Urgent | High Priority | Completed | 5/25/24 | 5/20/24 |
| 1832 | 2nd floor South Men's sinks | Repair | High Priority | Completed | 10/29/24 | 10/28/24 |
| 1850 | Powercat Financial office thermostat setting | Custodial | High Priority | Completed | 11/8/24 | 11/7/24 |
| 1680 | Birds nesting in opening under the south entrance canopy | Cosmetic | High Priority | Completed | 5/25/24 | 5/22/24 |
| 1852 | Damaged ceiling tile in Konza Hallway need repair / replaced. | Cosmetic | High Priority | Completed | 11/9/24 | 11/8/24 |
| 1437 | dish machine rinse temp not reaching 180 | Safety | High Priority | Completed | 9/9/23 | 9/8/23 |
| 1419 | deodorizer | Repair | High Priority | Completed | 8/26/23 | 8/25/23 |
| 1853 | Freight elevator door will not shut. | Repair | High Priority | Completed | 11/19/24 | 11/17/24 |
| 1435 | air freshner | Urgent | High Priority | Completed | 9/8/23 | 9/7/23 |
| 1857 | Rail cooler is running warm | Repair | High Priority | Completed | 11/20/24 | 11/19/24 |
| 1681 | Extractor | Repair | High Priority | Completed | 5/23/24 | 5/22/24 |
| 1422 | Puke everywhere on floor of mens bathroom and dirty shower health and safety concern | Custodial | High Priority | Completed | 8/27/23 | 8/26/23 |
| 1685 | South Elevator is not working. | Repair | High Priority | Completed | 5/31/24 | 5/29/24 |
| 1687 | drain in womens bathroom is coming up | Repair | High Priority | Completed | 5/31/24 | 5/30/24 |
| 1856 | Fry dump station is not hot enough | Repair | High Priority | Completed | 11/20/24 | 11/19/24 |
| 1690 | 227 projector | IT | High Priority | Completed | 6/4/24 | 6/3/24 |
| 1695 | North Vestibule Plaques | Unspecified Assistance | High Priority | Completed | 6/30/24 | 6/14/24 |
| 1429 | Handicap button. | Safety | High Priority | Completed | 9/14/23 | 9/6/23 |
| 1428 | Lights in South Women's Restroom on 2nd weren't coming on | Repair | High Priority | Completed | 9/5/23 | 9/3/23 |
| 1727 | drain blockage | Repair | High Priority | Completed | 7/20/24 | 7/17/24 |
| 1854 | Website | IT | High Priority | Completed | 11/22/24 | 11/18/24 |
| 108 | Remove empty wooden frames | Cosmetic | High Priority | Completed | 5/31/18 | 5/25/18 |
| 209 | Install picture frame | Cosmetic | High Priority | Completed | 8/18/18 | 8/10/18 |
| 207 | Add frame hangers | Urgent | High Priority | Completed | 8/18/18 | 8/10/18 |
| 206 | Sharps containers are full | Safety | High Priority | Completed | 8/10/18 | 8/9/18 |
| 205 | 226 Table needs closers fixed | Repair | High Priority | Completed | 8/10/18 | 8/9/18 |
| 211 | Remove scaffolding from Ballroom | Unspecified Assistance | High Priority | Completed | 8/14/18 | 8/13/18 |
| 203 | Rocket Bowl lights | Enhancement | High Priority | Completed | 8/18/18 | 8/9/18 |
| 202 | Adjust shelf in Cashier's office and help lift boxes onto shelves | Enhancement | High Priority | Completed | 8/9/18 | 8/9/18 |
| 200 | toliet wont completly flush | Repair | High Priority | Completed | 8/10/18 | 8/9/18 |
| 214 | Clean Food Pantry drop off location | Custodial | High Priority | Completed | 8/22/18 | 8/14/18 |
| 215 | Lock Problems | Repair | High Priority | Completed | 8/15/18 | 8/15/18 |
- ‹ previous
- 3 of 47
- next ›

