206 Sharps containers are full Safety High Priority Completed 8/10/18 8/9/18
154 Paint and Patch Cosmetic High Priority Completed 7/4/18 7/3/18
8 Toilet still leaking Repair High Priority Completed 1/16/18 1/17/18
992 Toilet not flushing Repair High Priority Completed 4/26/22 4/25/22
1419 deodorizer Repair High Priority Completed 8/26/23 8/25/23
122 Missing floor tile and grout. Cosmetic High Priority Completed 6/9/18 6/5/18
1083 Light fixture is buzzing Repair High Priority Completed 8/17/22 8/16/22
897 Art gallery Repair High Priority Completed 10/15/21 10/11/21
770 urinal wont flush through Repair High Priority Completed 9/3/20 9/2/20
1907 Freight elevator is not working Repair High Priority Completed 1/20/25 1/19/25
1589 water is dripping from the faucet Urgent High Priority Completed 3/8/24 3/7/24
643 Repaint the east wall in the Bluemont Room Cosmetic High Priority Completed 10/24/19 10/28/19
1480 Multiple lights out in Forum Hall Urgent High Priority Completed 11/3/23 11/2/23
1268 Washing Machine broken Repair High Priority Completed 4/19/23 4/12/23
377 Low batteries Repair High Priority Completed 12/8/18 12/7/18
207 Add frame hangers Urgent High Priority Completed 8/18/18 8/10/18
468 automatic door button not working Repair High Priority Completed 4/2/19 4/1/19
1236 urinal issue Repair High Priority Completed 3/8/23 3/7/23
1872 The southwest exit door in U Ballroom is stuck open. Safety High Priority Completed 11/28/24 11/25/24
562 Ground South entrance door trim bent preventing door from fully opening Repair High Priority Completed 7/18/19 7/18/19
993 Sink not working Repair High Priority Completed 4/26/22 4/25/22
530 Base moulding coming off in CSI Office Safety High Priority Completed 6/8/19 6/4/19
1943 126 Women's Bathroom Sinks Repair High Priority Completed 3/15/25 3/4/25
1909 East entryway exterior doors Unspecified Assistance High Priority Completed 1/22/25 1/21/25
867 Key pad not working Repair High Priority Completed 6/8/21 6/7/21
644 Damaged paint and plaster on corner in K Ballroom Cosmetic High Priority Completed 10/24/19 10/28/19
504 Soap dispenser fell off the wall Repair High Priority Completed 5/8/19 5/7/19
1269 Washing Machine broken Repair High Priority Completed 4/19/23 4/12/23
378 Data conduit into Art Gallery Enhancement High Priority Completed 12/13/18 12/12/18
1685 South Elevator is not working. Repair High Priority Completed 5/31/24 5/29/24
740 tile issue in food court Repair High Priority Completed 8/7/20 8/6/20
612 Keg cooler with Kombucha at Union Kitchen has quit pouring Urgent High Priority Completed 9/11/19 9/10/19
1237 pull the bowling machine lane oiler crate out of maintenance room Unspecified Assistance High Priority Completed 3/8/23 3/7/23
1876 Door trim on SE elevator door is loose. Cosmetic High Priority Completed 12/6/24 11/27/24
707 Handrail bracket off rail in Forum Hall Safety High Priority Completed 5/30/20 5/15/20
156 Rehang Director's Portraits Cosmetic High Priority Completed 8/1/18 7/6/18
563 Building Operations Workroom door not closing Urgent High Priority Completed 7/19/19 7/18/19
10 Floor tile have come loose in the NE fire stairway. Urgent High Priority Completed 3/24/18 3/7/18
175 clogged drain Repair High Priority Completed 7/25/18 7/24/18
437 low water per flush Repair High Priority Completed 2/20/19 2/19/19
265 Acoustical panel coming off in the Bowling Center Cosmetic High Priority Completed 9/25/18 9/18/18
1944 Courtyard Can light Repair High Priority Completed 3/5/25 3/4/25
676 Railing wires have come loose. Cosmetic High Priority Completed 1/31/20 1/28/20
962 smell in Bluemont Kitchen Urgent High Priority Completed 3/4/22 3/3/22
1178 urinal issue Repair High Priority Completed 12/4/22 12/3/22
93 Toliet won't flush Repair High Priority Completed 5/21/18 5/20/18
78 toliet not flushing right Repair High Priority Completed 5/3/18 5/2/18
242 Install student leader photo boards Cosmetic High Priority Completed 9/8/18 9/5/18
1482 Repair of the automatic door open/closure Repair High Priority Completed 11/13/23 11/4/23
1270 Wheel on padded scrubber Repair High Priority Completed 4/14/23 4/13/23