Completed Orders
| Number | Title | Type of Problem |
Priority |
Progress Level | Requested Deadline? | Created |
|---|---|---|---|---|---|---|
| 302 | clogged water fountain | Repair | High Priority | Completed | 10/16/18 | 10/15/18 |
| 1498 | Deodorizer | Repair | High Priority | Completed | 11/28/23 | 11/22/23 |
| 388 | scrubber wouldnt shut off and had no suction | Repair | High Priority | Completed | 1/4/19 | 1/3/19 |
| 1039 | Build shelves and office chairs | Cosmetic | High Priority | Completed | 7/8/22 | 6/28/22 |
| 214 | Clean Food Pantry drop off location | Custodial | High Priority | Completed | 8/22/18 | 8/14/18 |
| 822 | Leaking toilet | Safety | High Priority | Completed | 2/26/21 | 2/24/21 |
| 271 | low water per flush | Repair | High Priority | Completed | 9/21/18 | 9/20/18 |
| 1467 | Toilet not flushing | Custodial | High Priority | Completed | 10/11/23 | 10/9/23 |
| 696 | Replacement of damaged ceiling tile in K and S Ballroom | Repair | High Priority | Completed | 2/5/20 | 2/26/20 |
| 1687 | drain in womens bathroom is coming up | Repair | High Priority | Completed | 5/31/24 | 5/30/24 |
| 921 | Auto scrubber fuse issue | Repair | High Priority | Completed | 12/8/21 | 12/7/21 |
| 356 | Re-Key door lock 304A | Enhancement | High Priority | Completed | 11/24/18 | 11/12/18 |
| 1348 | Padded scrubber batteries | Preventive Maintenance | High Priority | Completed | 6/16/23 | 6/15/23 |
| 574 | light bulbs | Safety | High Priority | Completed | 8/10/19 | 7/22/19 |
| 1223 | 1st sink in women's restroom is dripping. | Repair | High Priority | Completed | 2/25/23 | 2/19/23 |
| 337 | Broken door stop and needing two others installed | Safety | High Priority | Completed | 11/2/18 | 10/29/18 |
| 762 | Bad batteries | Repair | High Priority | Completed | 8/20/20 | 8/19/20 |
| 1196 | outlet in copy room not working | Repair | High Priority | Completed | 1/12/23 | 1/11/23 |
| 1946 | North Freight Elevator | Repair | High Priority | Completed | 3/11/25 | 3/10/25 |
| 634 | Molding coming loose | Cosmetic | High Priority | Completed | 10/23/19 | 10/18/19 |
| 420 | ice machine in Union Station | Safety | High Priority | Completed | 1/22/19 | 1/21/19 |
| 1727 | drain blockage | Repair | High Priority | Completed | 7/20/24 | 7/17/24 |
| 170 | primer on bowling pins | Unspecified Assistance | High Priority | Completed | 8/31/18 | 7/18/18 |
| 861 | Move network switch power to different breaker/cicuit. | Preventive Maintenance | High Priority | Completed | 6/30/21 | 5/24/21 |
| 729 | Tile loose | Safety | High Priority | Completed | 7/30/20 | 7/29/20 |
| 83 | Toliet wont flush | Repair | High Priority | Completed | 5/15/18 | 5/14/18 |
| 603 | Lock on the left door to the KSU Hallway will not unlock | Urgent | High Priority | Completed | 9/4/19 | 9/3/19 |
| 1040 | call in service on three pieces of equipment in CFA | Repair | High Priority | Completed | 6/8/22 | 6/29/22 |
| 215 | Lock Problems | Repair | High Priority | Completed | 8/15/18 | 8/15/18 |
| 272 | leaking water | Repair | High Priority | Completed | 9/21/18 | 9/20/18 |
| 1468 | Batterie issue | Preventive Maintenance | High Priority | Completed | 10/11/23 | 10/10/23 |
| 51 | Install cover on open floor draing in dry storage room. | Safety | High Priority | Completed | 4/6/18 | 4/3/18 |
| 357 | slow drain | Repair | High Priority | Completed | 11/13/18 | 11/12/18 |
| 1349 | Batterie issue | Repair | High Priority | Completed | 6/17/23 | 6/16/23 |
| 1224 | Replace light bulb | Repair | High Priority | Completed | 2/22/23 | 2/21/23 |
| 1655 | Faucet issue | Repair | High Priority | Completed | 4/26/24 | 4/25/24 |
| 17 | Remove current signs | Enhancement | High Priority | Completed | 3/16/18 | 3/12/18 |
| 763 | Faucet in south ground floor men's restroom not working. | Repair | High Priority | Completed | 8/24/20 | 8/19/20 |
| 1283 | Light | Repair | High Priority | Completed | 4/26/23 | 4/25/23 |
| 421 | ice machine in Union Station | Safety | High Priority | Completed | 1/22/19 | 1/21/19 |
| 248 | Hang final student leadership frame | Cosmetic | High Priority | Completed | 9/8/18 | 9/7/18 |
| 730 | dish machine not reaching temp | Safety | High Priority | Completed | 8/7/20 | 7/31/20 |
| 140 | Replace clock | Cosmetic | High Priority | Completed | 6/19/18 | 6/18/18 |
| 824 | Need our (3) coin machines cleaned and repaired | Preventive Maintenance | High Priority | Completed | 3/3/21 | 3/2/21 |
| 273 | Paint and Patch | Cosmetic | High Priority | Completed | 9/27/18 | 9/20/18 |
| 1561 | Door wont latch | Repair | High Priority | Completed | 2/17/24 | 2/16/24 |
| 358 | soap will not prime | Repair | High Priority | Completed | 11/14/18 | 11/13/18 |
| 108 | Remove empty wooden frames | Cosmetic | High Priority | Completed | 5/31/18 | 5/25/18 |
| 1225 | Window pane gaps | Repair | High Priority | Completed | 2/28/23 | 2/23/23 |
| 449 | Ice Cream machine is making a very loud metal rubbing against metal noise | Urgent | High Priority | Completed | 3/7/19 | 3/6/19 |
- ‹ previous
- 8 of 37
- next ›

