pipe leak

Number: 2391

Post date: March 30, 2026

Submission

Name: Nelson Barton

Department: Building operations

Email: nbarton@ksu.edu

Phone: (785) 776-1458

Type of Problem: Repair

Priority: High Priority

Long Description of Problem: 

The urinal in the south men's restroom on second floor still has a small leak on the pipe that goes to the flush valve. This is the left urinal.

Specific Location: 2 - 220 - 2nd Floor South Men's Restroom

Requested Deadline?: March 31, 2026

Work Details

Progress Level: Completed