Completed Orders
| Number | Title | Type of Problem |
Priority |
Progress Level | Requested Deadline? | Created |
|---|---|---|---|---|---|---|
| 804 | Carpet edging has come loose | Cosmetic | Address When Possible | Completed | 1/30/21 | 1/11/21 |
| 453 | light out | Repair | Address When Possible | Completed | 3/9/19 | 3/8/19 |
| 1113 | Bosco plaza drain plugged | Safety | Address When Possible | Completed | 9/24/22 | 9/23/22 |
| 682 | rephoster and gloss office chair | Cosmetic | Address When Possible | Completed | 2/29/20 | 2/3/20 |
| 1330 | Damaged wall spots in Cottonwood Room | Cosmetic | Address When Possible | Completed | 6/10/23 | 6/1/23 |
| 1331 | Arm covering falling off | Cosmetic | Address When Possible | Completed | 6/16/23 | 6/2/23 |
| 57 | Veteren's Center Cable TV | Enhancement | Address When Possible | Completed | 4/30/18 | 4/10/18 |
| 772 | marking on power outlet | Cosmetic | Address When Possible | Completed | 9/9/20 | 9/8/20 |
| 1795 | Wall by Panda | Repair | Address When Possible | Completed | 9/28/24 | 9/27/24 |
| 995 | Base moulding on 2nd floor concourse needs repair | Repair | Address When Possible | Completed | 5/7/22 | 4/26/22 |
| 1637 | 2nd concourse | Repair | Address When Possible | Completed | 3/22/24 | 4/15/24 |
| 1968 | Women's locker room lights | Repair | Address When Possible | Completed | 4/3/25 | 4/2/25 |
| 334 | Broken ScreenFlex | Repair | Address When Possible | Completed | 10/25/18 | 10/24/18 |
| 649 | Loud noises, bangs, squeaking, etc. | Repair | Address When Possible | Completed | 11/11/19 | 11/7/19 |
| 1297 | Fry frier leaks when filtering oil | Repair | Address When Possible | Completed | 5/6/23 | 5/5/23 |
| 149 | Patch hole in drywall | Cosmetic | Address When Possible | Completed | 7/31/18 | 6/22/18 |
| 1086 | Lights out in the 2nd floor radio room | Safety | Address When Possible | Completed | 8/23/22 | 8/18/22 |
| 1744 | Hang two whiteboards in office | Unspecified Assistance | Address When Possible | Completed | 8/16/24 | 8/6/24 |
| 963 | power outlet in jps not working | Repair | Address When Possible | Completed | 3/4/22 | 3/3/22 |
| 419 | Light bulb about end of life | Preventive Maintenance | Address When Possible | Completed | 1/26/19 | 1/18/19 |
| 745 | Globe light burnt out | Cosmetic | Address When Possible | Completed | 8/8/20 | 8/7/20 |
| 1390 | Hang Projector screen for esports | Enhancement | Address When Possible | Completed | 8/16/23 | 8/3/23 |
| 300 | Door closure needing adjustment | Repair | Address When Possible | Completed | 10/18/18 | 10/12/18 |
| 1607 | install new projector screen and fsr box in 207 | Enhancement | Address When Possible | Completed | 5/4/24 | 3/21/24 |
| 117 | Beeping deodorizer | Repair | Address When Possible | Completed | 6/5/18 | 6/4/18 |
| 1054 | power outlet loose | Repair | Address When Possible | Completed | 7/21/22 | 7/20/22 |
| 550 | base board is coming away from the wall in Vet Cntr | Repair | Address When Possible | Completed | 7/3/19 | 7/2/19 |
| 487 | Base of chair came off | Repair | Address When Possible | Completed | 4/24/19 | 4/23/19 |
| 387 | Clogged Floor Drains | Repair | Address When Possible | Completed | 1/12/19 | 1/3/19 |
| 712 | Bike repair station sign is becoming detached from the exterior wall. | Cosmetic | Address When Possible | Completed | 8/8/20 | 6/9/20 |
| 1708 | Locker room emergency lighting | Enhancement | Address When Possible | Completed | 7/4/24 | 7/3/24 |
| 1146 | Walk-in freezer door will not shut all the way, resulting in ice buildup on door frame | Repair | Address When Possible | Completed | 10/25/22 | 10/24/22 |
| 1890 | Table legs | Repair | Address When Possible | Completed | 12/13/24 | 12/12/24 |
| 936 | Floor sign at Panda Express need to be tightened up. | Cosmetic | Address When Possible | Completed | 1/7/22 | 1/4/22 |
| 268 | Removal of out of date building sign | Cosmetic | Address When Possible | Completed | 9/29/18 | 9/19/18 |
| 228 | light out | Repair | Address When Possible | Completed | 8/30/18 | 8/29/18 |
| 90 | water leaking from a letdown cooler on the front line of Just Salad | Repair | Address When Possible | Completed | 5/23/18 | 5/17/18 |
| 518 | Cabinet door hinge broken | Repair | Address When Possible | Completed | 5/31/19 | 5/16/19 |
| 805 | light bulbs | Repair | Address When Possible | Completed | 1/12/21 | 1/11/21 |
| 1450 | East Elevator Not Working | Repair | Address When Possible | Completed | 9/25/23 | 9/24/23 |
| 454 | Beeping deodorizer | Repair | Address When Possible | Completed | 3/9/19 | 3/8/19 |
| 1238 | Moving shelving from catering to bowling and other kitchen | Unspecified Assistance | Address When Possible | Completed | 3/8/23 | 3/7/23 |
| 1670 | light out | Unspecified Assistance | Address When Possible | Completed | 5/14/24 | 5/11/24 |
| 1541 | deodorizer is beeping in south men's restroom on first | Custodial | Address When Possible | Completed | 1/19/24 | 1/18/24 |
| 684 | back flow valve needs repaired | Repair | Address When Possible | Completed | 2/11/20 | 2/10/20 |
| 1332 | leaking toilet | Repair | Address When Possible | Completed | 6/3/23 | 6/2/23 |
| 1207 | deodorizer | Repair | Address When Possible | Completed | 1/31/23 | 1/30/23 |
| 1424 | The leak from subway dripped onto esports ceiling | Repair | Address When Possible | Completed | 8/29/23 | 8/28/23 |
| 650 | grease tank is full | Unspecified Assistance | Address When Possible | Completed | 11/20/19 | 11/19/19 |
| 1298 | Sifter basket needs repaired | Repair | Address When Possible | Completed | 5/6/23 | 5/5/23 |
- ‹ previous
- 32 of 37
- next ›

