Completed Orders

E.g., 4/27/26
E.g., 4/27/26
Completed Orders
Number Title Type of Problem Prioritysort descending Progress Level Requested Deadline? Created
1951 Women's Bathroom Light out Repair High Priority Completed 3/19/25 3/14/25
1953 Refrigerator in the ground floor break room is running hot. Repair High Priority Completed 3/24/25 3/17/25
1954 ground floor south handicap door Repair High Priority Completed 3/18/25 3/17/25
1955 All-gender pipe leak Repair High Priority Completed 3/18/25 3/17/25
1957 Toilet leak Repair High Priority Completed 3/20/25 3/19/25
1962 Konza Room Clock Repair High Priority Completed 4/5/25 4/1/25
1963 Multiple lights out in the Ballroom Repair High Priority Completed 4/11/25 4/1/25
1969 K/S wall Repair High Priority Completed 4/4/25 4/3/25
1973 urinal is backing up Urgent High Priority Completed 4/8/25 4/7/25
1974 Broken wall section Repair High Priority Completed 4/10/25 4/9/25
1978 Remove plaques Cosmetic High Priority Completed 4/16/25 4/11/25
1982 Freight Elevator Repair High Priority Completed 4/13/25 4/12/25
1983 Light board in Forum Hall IT High Priority Completed 4/15/25 4/13/25
1984 2nd N. Women's Restroom Repair High Priority Completed 4/15/25 4/14/25
1987 Hang clock and pictures Cosmetic High Priority Completed 5/1/25 4/16/25
1988 UGB Plaque removal Unspecified Assistance High Priority Completed 4/18/25 4/17/25
1991 Crestron in Wildcat Chamber IT High Priority Completed 4/18/25 4/17/25
1994 Rehang plaques Cosmetic High Priority Completed 4/26/25 4/23/25
1996 Main/West Wall panel Repair High Priority Completed 4/24/25 4/23/25
2012 Can light out SW corner of the Courtyard ceiling Repair High Priority Completed 5/2/25 4/30/25
2016 Lock Repair High Priority Completed 5/10/25 5/2/25
2020 Restroom sinks Repair High Priority Completed 5/6/25 5/5/25
2022 Union 302 Office temperature Unspecified Assistance High Priority Completed 5/8/25 5/7/25
2030 Breaker 18 is going out Repair High Priority Completed 5/16/25 5/15/25
2035 Door issue Repair High Priority Completed 5/30/25 5/22/25
2036 TOO COLD! Unspecified Assistance High Priority Completed 5/24/25 5/23/25
2038 Susan Bosco perpetual plaque Unspecified Assistance High Priority Completed 5/28/25 5/27/25
2040 2nd N. Men's sink Repair High Priority Completed 5/30/25 5/29/25
2042 Toilet not flushing Repair High Priority Completed 6/3/25 6/2/25
2047 K/S ballroom wall Repair High Priority Completed 6/7/25 6/6/25
2055 Forum Men's Handicapped button Repair High Priority Completed 6/18/25 6/17/25
2058 relocation of display brackets Enhancement High Priority Completed 6/26/25 6/23/25
2061 Add three outlets to the Hunt Brothers kiosk wall in the bowling Center Enhancement High Priority Completed 7/31/25 6/30/25
2062 Add an elbow to the drain pipe located on the north wall of the Hunt Brothers prep kitchen Enhancement High Priority Completed 7/23/25 6/30/25
2063 Issue with the Pepsi machine with fast track Repair High Priority Completed 7/2/25 7/1/25
2064 deodorizer is beeping Enhancement High Priority Completed 7/4/25 7/3/25
2065 deodorizer is beeping Unspecified Assistance High Priority Completed 7/8/25 7/7/25
2067 Deodorizer Repair High Priority Completed 7/12/25 7/9/25
2068 Washer issue Repair High Priority Completed 7/10/25 7/9/25
2082 Deodorizer is out Enhancement High Priority Completed 7/19/25 7/18/25
2083 Deodorizer is out Enhancement High Priority Completed 7/19/25 7/18/25
2084 Deodorizer is out Enhancement High Priority Completed 7/19/25 7/18/25
2085 Deodorizer is out Enhancement High Priority Completed 7/19/25 7/18/25
2086 we need to hang two paintings in the union side of the multicultural center. Cosmetic High Priority Completed 7/24/25 7/22/25
2089 Water fountain on 1st floor by the restrooms needs a filter change Unspecified Assistance High Priority Completed 7/24/25 7/23/25
2091 Ballroom fire door is sticking and will not close on it own. Safety High Priority Completed 8/8/25 7/24/25
2092 Canister light Repair High Priority Completed 7/31/25 7/24/25
2093 water leak and tile replacement Repair High Priority Completed 7/31/25 7/30/25
2094 Carpet cleaning Custodial High Priority Completed 8/9/25 7/31/25
2096 Temperature Unspecified Assistance High Priority Completed 8/5/25 8/4/25
Export Completed Orders